Enough with the LIPA bashing

Rate this topic


LI BeachRat

Recommended Posts

After reading the responses here, watching the news, etc....are you still defending LIPA or have you reconsidered?

 

From an interview with an out of state crew on the radio it sounds like not all the problems are due to LIPA. He spoke of red tape and NY goverment rules being a big problem. He was one of 20 trucks held up at a tunnel for 3 hours just to get here.

Now I hear that Suffolk wants LIPA to just fix the lines and let the home owners worry if their homes wiring is ok. Everyone says they like this. Ok when someone gets electrocuted or the house burns down who do you think will get the blame.

As far as trimming trees LIPA in my area has been doing it all summer, to the point some trees don't even look like trees. We still had trees come down. Their job is to trim trees that may hurt the wires, not to do tree removal for you, so that you don't have to shell out for it. It's your tree.

As I said before as roads are opened or widden than put the lines under ground. Some of you sound like you want every tree on LI cut down and paved over. If thats the case go back to the city.

My bitch is where's the gas?

Link to comment
Share on other sites

I have a childhood friend that is a senior manager at Keyspan and lives in my neighborhood (same grid as he puts it) and we had lights within two days. When we lost them for the second time on Saturday, we had them back on in 8 hours. For Irene last year we were out for only 4 hours. Proof positive that someone has influence over Keyspan.

 

BTW, LIPA is a customer of Keyspan which owns the rights to the infrastructure and is responsible for maintaining it. LIPA has no control over Keyspan, which is owned by a British company.

 

The crews working in my area are from Albany NY, and do lousy work according to my friend. Ke says that crews from Missouri are the best in the nation - at least that's his opinion.

Democracy is not being a robot and doing what your party tells you to do.

America, a country so great that even its haters refuse to leave. 

Link to comment
Share on other sites

 

As far as trimming trees LIPA in my area has been doing it all summer, to the point some trees don't even look like trees. We still had trees come down. Their job is to trim trees that may hurt the wires, not to do tree removal for you, so that you don't have to shell out for it. It's your tree.

As I said before as roads are opened or widden than put the lines under ground. Some of you sound like you want every tree on LI cut down and paved over. If thats the case go back to the city.

 

Good for you. There has been NO tree trimming here, this year or last. And I don't see anyone here asking for free tree removal. Also don't see anyone asking to have every tree on LI cut down. On-going, consistent tree trimming would have gone a long way to prevent a lot of the problems we saw; why do you think they make believe that they do it? It's common sense.

 

Go ahead and defend them...it's your right. I think they suck.

Link to comment
Share on other sites

I LOVE LIPA. Live in Northport been out since last Monday. Mind you that everyone else around me has power. Just the one little strip of homes I'm in does not. Was told I'd be up by this Wednesday. Now I am told that I'll be up by next Monday. Next Monday, I assume there will be no power and they'll tell me the next Thursday. Good thing I have family in NJ to stay with (they have power).

Link to comment
Share on other sites

i have been with out power since the storm every area surounding oceanside other than long beach is on i think. not a single truck in my neighborhood. have no clue if you go on there website you can click on the area you live in and it will tell you how many customers are out of power in your area. i have 3000 or so customers including myself out that is my hole neoghborhood. they are a bunch of asses. i moved from brooklyn to the island. jesus i wish they would just give con ed the go for the island. people s housing are taking a beating with this cold weather. what are we suppose to do. i understand people have had it worse. and i am not gloting about it. but they dont even tell what there plan of attack is. i have to here this and that on this website. my house needs to be repaired from my walls, floor, to my boiler, my panel never got wet just the outlets on the floor so i think iam ok with that

Link to comment
Share on other sites

Good luck everyone, i went out before for around two hours and when i came back a new pole was put in by verizon, imagine that two hours! Now lipa just needs to hook the power lines to it. Im not saying it is easy and have no idea what its all about, but this **** sucks, ten days! The verizon guy said at least five more to go. I bought the crew coffee and snacks, they were a cool bunch.... Looked exhausted!

"Dont elect a scumbag, no riots, so easy even the alt right should be able to figure it out." - numbnuts

Link to comment
Share on other sites

heads up brothers of the lure lol. (i like that one) any way i was reading the lipa site. i read that they have deployed inspectors to neighborhood house to conduct inspections to determine if the power can be turned on. if it is ok to do so they schedule a date for lipa to put your power on even if your neighbors cant have teres on. nowi also read that if they come and you are not home qhich most of us are:(. they will leave a letter saying they came and to reschedule a date for them to come. wait theres more, if you do not feel like waiting for the power company inspectors you can hirer a licensed electricians or electrical agency to come inspect your home and then send a letter or reciept or something type of paprer work signed by the electrician that is ok to put power on . fax it over to there fax number which you can get on there site and they will be in contact with to put your power back on. hope this helps somewhat i feel bad for all the families who lost everything, but i have a family of my own and thats all i am constantly thinking about. good luck to you guys if i here of anything i will update.

Link to comment
Share on other sites

Cuomo is an idiot..I want Cristie as Govt. 

 

Everyone in government is an idiot. Do you think any of these fat belly suits are suffering one bit from this? They are bashing Lippa to cover there own asses. Consideriing Long island is over populated by ohhh at least 4 million people, Lippa and all the crews from other states are doing a great job. There is a huge conspiracy going on. Start prepping folks. Food, water, guns and ammo. Sh*ts gonna hit the fan real soon.

Fish Hard or GO HOME...
Link to comment
Share on other sites

Good for you. There has been NO tree trimming here, this year or last. And I don't see anyone here asking for free tree removal. Also don't see anyone asking to have every tree on LI cut down. On-going, consistent tree trimming would have gone a long way to prevent a lot of the problems we saw; why do you think they make believe that they do it? It's common sense.

Go ahead and defend them...it's your right. I think they suck.

 

well on Monday they were predicting 90% of customers to have power (a week after being able to asses the damage, resources and a experience)

 

it was 300,000 on wednesday and now they are talking about after thanksgiving

 

 

I'm not sure how you be so off the mark so quickly after having a week to asses the situation, but that reflects poorly on management at a basic managerial task.

"... let it go - lets move forward."

Link to comment
Share on other sites

Good for you. There has been NO tree trimming here, this year or last. And I don't see anyone here asking for free tree removal. Also don't see anyone asking to have every tree on LI cut down. On-going, consistent tree trimming would have gone a long way to prevent a lot of the problems we saw; why do you think they make believe that they do it? It's common sense.

Go ahead and defend them...it's your right. I think they suck.

 

 

are you even on Long Island? i don't see alot of branches knocking down wires around here. i do see a ****-ton of 60, 70 foot plus oaks, maples and conifers laying on the the ground thouggh.

FS-VS250  FS-Lead-$1/lbs

Link to comment
Share on other sites

today's newsday article, basically reams them out:

 

Why LIPA failed: Utility ignored warnings it wasn't ready for major storm

 

The Long Island Power Authority’s agonizingly slow response to Sandy came after warnings as far back as 2006 that the utility was unprepared to handle a major storm, failed to upgrade antiquated technology, neglected vital maintenance and regularly underbudgeted for storm response.

 

A state report and a review of records show that the regional utility lagged behind industry standards by not using smartphones and digital tablets — and at times even printers or fax machines — in favor of pen-and-paper memos and dial-up Internet access.

 

The utility’s critically important power outage management system, which helps direct the recovery response, operates on a 25-year-old mainframe computer that was cited as one of the biggest shortcomings in the utility’s response to Tropical Storm Irene in August of last year.

 

LIPA chief operating officer Michael Hervey said the new outage management system, which LIPA had contracted last year to replace, had not yet been implemented.

 

However, he added, “All of the significant items we had already implemented or started to implement,” even before the Public Service Commission report was released.

 

LIPA neglected basic maintenance to prevent outages, such as replacing rotting poles and trimming trees around power lines, according to a state report released by the Public Service Commission’s Public Service Department in June. The $3.7 billion-a-year government-owned corporation spent $37.5 million less than committed over five years on hardening the grid to protect against major storm damage, according to the report.

 

Thursday, a Newsday reporter at the Hicksville headquarters of National Grid — the company contracted by LIPA to oversee operations — saw engineers who were using highlighters and paper maps to track thousands of outages, as ratepayers banged in frustration on the building’s locked front doors.

 

Ten days after the superstorm battered the region, more than 170,000 Long Islanders were still without power. The nor’easter on Wednesday piled on with another 90,000 outages.

 

From village trustees to Gov. Andrew M. Cuomo to the U.S. Homeland Security Secretary Janet Napolitano, public officials have criticized LIPA for its response to Sandy.

 

Hervey noted that LIPA, in a 109-page study conducted before the PSC report was released, identified many of the problems that were later noted in the report.

 

LIPA this year increased its budget for storms to the largest amount it has to date this year — in excess of $50 million. But Hervey noted major hurricanes open up entirely new cost centers of their own. “We don’t budget for hurricanes of this size,” he said.

 

Last year, LIPA and a company called Efacec Advanced Control Systems announced that the authority would implement a real-time distribution and outage management system. It is not expected to be in place until next year.

 

The state report calls into question how seriously LIPA and National Grid took the lessons they learned from Irene.

 

“It was stated that no storm like Irene had been seen since Hurricane Gloria in 1985,” the inspectors wrote in the report. “We frequently heard that Irene may be a once in a career or lifetime event.”

 

It was not.

 

Antiquated infrastructure

 

The utility’s infrastructure has changed little since Gloria, said Matthew Cordaro, who served as vice president of engineering at LIPA’s predecessor, the Long Island Lighting Co., when that hurricane struck.

 

“I think somewhere along the way they lost sight of what the primary mission of a utility is,” Cordaro said Thursday, “and that is to provide cheap electric power to customers.”

 

Alexandra von Meier, the co-director of electric grid research at the California Institute for Energy and Environment, said other utilities face similar challenges.

 

“I don’t think it’s very unusual to have very old and clunky technology in their power distribution context,” she said. “If they were more modern ... restoration could be faster, and we all want that.”

 

More than a half-million residents lost power for a week after Irene. Cuomo — who said that “at a minimum, LIPA did a terrible job of communicating” following that tropical storm — requested a review of the Uniondale-based utility.

 

The resulting report concluded that LIPA and National Grid did not meet industry standards in dozens of aspects concerning planning and recovery in major storms.

 

To survey storm damage, engineers used spotty equipment, including expired Internet aircards for their laptops, the state inspectors found. Their computers used COBOL, a basic decades-old computer programming language, and some lacked electronic mapping for outages and used a “rudimentary damage prediction model.”

 

Even fax machines and other basic office equipment were unavailable or broken at substations, the facilities that transfer power to thousands of homes, hindering communication. One substation coordinator reported having to run to a local office supply store to purchase a printer.

 

Year after year, despite warnings, the utility failed to spend money on storm-readiness measures, said Walter Drabinski, president of Vantage Energy Consulting Llc, the company hired by the state to assist with the report. He said they “did not budget what they should have.”

 

Recognizing that the utility was vulnerable to a big storm, LIPA hired a consultant several years ago to look at ways to harden the system. The report by Navigant Consulting was finished in 2006 and included numerous recommendations such as upgrading the computer system, reconfiguring substations to minimize flood damage, and doing more to trim trees and inspect poles.

 

Newsday requested a copy of the 2006 report early this week. By Thursday, LIPA officials had not provided it.

 

In the state report released in June, assessors found LIPA had failed to heed many of the 2006 study’s recommendations. Drabinski said budget issues likely contributed to delays.

 

LIPA’s customers already pay among the highest rates in the country. The utility is saddled with almost $7 billion in debt. “All of these things were identified but they all cost money,” Drabinski said.

 

At the time, LIPA committed to spending $20 million a year on so-called “storm hardening” — projects to bolster the system, according to the June report. But from 2006 through 2010, the utility budgeted only an average of $13.2 million a year for such projects, and of that, spent only $12.5 million a year, according to the report.

 

Even cheap measures were neglected by LIPA, according to the June report. LIPA lacked basic procedures for clearing roads outside of hospitals and schools, locating and repairing downed wires, communicating with customers and keeping call centers working, maintaining poles, and trimming trees around power lines in order to prevent “tree-caused outages associated with major storm events.”

 

LIPA spends less thinning vegetation around transmission stations than other utilities, clears less — 6 feet around distribution equipment as compared with the industry standard, which is 10 feet — and doesn’t have a consistent cycle for trimming trees. Workers might not hit some trees for seven or eight years, according to the report, which recommended a four-year cycle.

 

LIPA stopped funding a program to inspect distribution poles in 2006. The program was supposed to restart in 2013 and scheduled to be done by 2022. The utility’s spending on transmission pole replacement dropped from $2.7 million in 2006 to less than $800,000 in 2011, according to the report.

 

“I guess the good news is they don’t have to do the inspections because all the bad poles broke” in Sandy, Drabinski said.

 

LIPA does have a good system that is reliable under normal conditions, Drabinski said. But the utility faces unique challenges because of the Island’s geography — exposed to the elements and accessible by outside crews from only one direction. As a result, the utility needs to plan differently than others when it comes to lining up workers to restoration efforts.

 

But LIPA’s biggest flaw identified by the report was the utility’s inability to communicate well with the public. Clogged call centers are especially problematic since LIPA relies on customers to report their own individual outages.

 

Since 2006, according to the state report, LIPA has lacked a system to give customers accurate estimates on when their power would be restored. After Sandy, the utility used an online map that showed more outages than there were customers, and featured inaccurate recovery information.

 

Shortly after a Newsday article pointed out the inaccuracies, LIPA removed the site for a day and posted a pared-down version.

 

“The whole system is just completely unorganized,” said state Sen. Charles J. Fuschillo (R-Merrick), “and in this day and age with the technology available and the fact that they went through this already with Irene, they should have been better prepared.”

 

One thing LIPA has continually managed to communicate is statements attesting to Sandy’s strength. Spokesman Mark Gross said that “customers should be prepared to wait a bit longer” for the return of power than the utility estimated. “We did say seven to 10 days originally, but this storm was worse than anyone could have predicted.”

 

In fact, in the week preceding Sandy, fire chiefs, county executives and meteorologists warned that it would be one of the most powerful storms in Long Island history. Sustained wind gusts of 80 mph and flood surges reaching 20 feet were accurately predicted. As early as Oct. 26, three days before Sandy reached Long Island, the National Weather Service warned that the storm could be stronger than Irene.

 

In the wake of the devastation, customers and public officials have complained of the breakdown in communication from LIPA. Asked why customers were learning more than a week after Sandy hit that surveyors needed to inspect their flooded homes before reinstating their electricity, Hervey said: “This is where we are in the process. I really don’t want to argue about timing or whether something should have been done earlier in the process.”

 

Little outside oversight

 

LIPA is run by a 15-member board of nonutility professionals that includes lawyers, bankers and accountants. There is little outside oversight. That contrasts with other privately owned utilities subject to regulation by the state Public Service Department, which has hundreds of professional energy experts, rate reviewers and other specialists.

 

As a result, LIPA operates largely free from independent scrutiny of its rates, its spending and its management effectiveness. The LIPA board tends to act in concert. Most of its decisions on spending, strategic directions and contracts are unanimous.

 

There have been attempts to put LIPA under the Public Service Department’s jurisdiction, if only for rate hikes, but LIPA officials have always invoked the threat of a ratings downgrade. Wall Street likes LIPA to have the ability to raise rates as it needs to recoup costs. A LIPA oversight bill enacted in Albany in January once again left LIPA free from department oversight, although the bill did provide for PSC management audits for LIPA for the first time in its history. One is under way now.

 

The Suffolk County Legislature has established a committee to exert some oversight over LIPA, but its actions are not legally binding, said Paul Sabatino, who served as counsel to the legislature for 20 years. Sabatino said that the original state statute that created the utility exempted it from the Public Service Commission’s legally binding orders and decisions.

 

Evidence suggests that greater oversight can improve performance.

 

Following Hurricane Irene and a powerful winter storm in October of 2011, Connecticut’s utilities regulator criticized Connecticut Light & Power for its “deficient and inadequate” response. There were calls to get tougher with the utility, which already fell under the jurisdiction of the state’s Public Utilities Regulatory Authority.

 

Though it says the move is unconnected to last year's storms, CL&P increased its spending on tree trimming to $54 million this year, up from $27 million in 2011. The state passed legislation in May that, among other things, subjects utilities like CL&P to a mandatory review by regulators after storms that cause major outages.

 

After Sandy, CL&P said outages affected 850,000 of their 1.24 million customers. The utility promised to restore power to 98 percent of their customers by Monday or Tuesday of last week. Monday, they reached that goal.

 

Roy Occhiogrosso, senior adviser to Connecticut Gov. Dannel P. Molloy, said CL&P was prepared for Sandy and had improved communication with the public. The utility, he said, seemed to be shaping up.

 

“There is going to be a formal review of their performance,” he said. “Preliminarily, it seems that they have done better.”

 

National Grid started locking the front door to its Hicksville headquarters on the second day of the outage. Thursday, a steady trickle of frustrated and angry customers stood at those doors banging on the glass — pleading for help, demanding answers or just shouting in frustration.

 

One woman asked through the glass to talk to whoever was running things.

 

“There’s no one in charge to see,” a security guard told her.

 

With Mark Harrington, Robert Lewis, Sandra Peddie and Adam Playford

 

WHAT LIPA DIDN'T DO

 

At the request of New York State's Department of Public Service, a consulting firm reviewed the Long Island Power Authority and National Grid's 2011 response to Tropical Storm Irene. The review found significant problems with the two entities, including:

 

-- They ignored a 2006 recommendation to replace an outdated outage management system, which runs on a 25-year-old mainframe computer running COBOL, a computer language considered obsolete. The system had been "patched together over many years" and "lacks the ability to manage large-scale outages" or "take advantage of current advances in technology."

 

-- The outage management system was "one of the biggest shortcomings in the storm restoration effort." It was set to be replaced in late 2012, but will "likely take several years to be fully functional."

 

-- Many employees underestimated the likelihood of another major storm hitting Long Island, calling Irene a "once in a career or lifetime event."

 

-- Instead of smartphones or tablets to input data or receive maps, crews rely on paper maps and pencils.

 

-- Some substations used dial-up modems to access the Internet, and printers and fax machines didn't work.

 

-- National Grid used a "rudimentary" damage prediction model.

 

-- Recommendations from 2006 to harden the system against storms had been "implemented slowly or incompletely," including "many improvements that could be made at a reasonable cost."

 

-- LIPA stated that it reviewed its storm and emergency response policy annually, but the plan still referred to its relationship with KeySpan, the company it worked with until National Grid acquired it in 2008.

 

THE LIPA BOARD

 

In 1995, the State Legislature changed the law to make the Long Island Power Authority board of trustees an appointed body.

 

Nine members are named by the governor; three are named by the leader of the State Senate; and three are chosen by the Assembly leader. Only 10 positions are currently filled.

 

The board oversees all major authority decisions, including choosing a manager for the electric grid, purchasing power from generating plants, developing new power-generation projects and hiring a CEO and filling other top positions.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to register here in order to participate.

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now


×
×
  • Create New...